Skip to Content
RTK stakeout

Bring your design
onto the site.

Less manual transcriptionClearer field guidanceTraceable handover
FJD Trion field team carrying out an outdoor survey
Construction layout · Site verification · Survey control
50%

Fewer crew-hours

Illustrative labour estimate
Less re-entry

Workflow benefit

Carry design coordinates into the field and retain the checked results.
Workflow

From field preparation
to project handover.

Construction layout · Site verification · Survey control

04 steps · Drag or swipe to explore
Trion Survey official reference · Field project setup
Step 01

Prepare
the survey

Confirm the drawing revision, units and coordinate reference system. Configure corrections and pole height, then check a known point.

Checks & results
Quality checks
Revision, units, coordinates, corrections, pole height and known point.
Deliverable
A checked project setup.

Why it mattersResolve reference errors before setting out.

V10A official field photo · Stakeout reference
Step 02

Set out
and check

Use the supported V10A guidance to locate the design point. Check positioning quality and record the coordinates and elevation.

Checks & results
Quality checks
Quality status and the supported task in the installed app.
Deliverable
Identified stakeout marks, coordinates and elevations.

Why it mattersKeep the field work tied to the approved design.

AI operation scene · Independent reference observation
Step 03

Verify
independently

Remeasure against the agreed reference and complete a closing check. Investigate differences against project tolerances.

Checks & results
Quality checks
Reference checks and closing check against project tolerance.
Deliverable
Recorded differences and exceptions.

Why it mattersDetect errors while correction is still practical.

Trion Survey official reference · CAD data review
Step 04

Export
the record

Save point IDs, readings, checks and the drawing revision. Confirm the receiving team can open the agreed output.

Checks & results
Quality checks
File readability, point IDs and retained checks.
Deliverable
The agreed record and original observations.

Why it mattersMake the handover traceable.

Official Trion Survey CAD reference · Not a same-project sample
Official Trion Survey CAD reference · Not a same-project sample
Deliverables

Deliverables for
your project team.

  • Design revision, units and coordinate reference
  • Coordinates, elevations and independent check results
  • Reviewed files with exceptions and operator notes

A verified project sample for this workflow will be added here. The reference image is not a same-project acceptance record.

Request a sample dataset

What could your team save?

Estimate labour savings, payback and five-year returns for your project.

Calculate your ROI
Application requirements

Is this the right fit
for your site?

Construction layout · Site verification · Survey control

What should be checked before work starts?

Drawing revision, coordinate reference, correction source, pole height, positioning status and an independent known point.

Does this replace professional construction surveying?

No. Agree the task and acceptance criteria with the responsible survey professional; routine field checks do not replace contractually required surveying.

Purchase & consultation

Specify the setup
for your project.

Choose your equipment, or talk through your project with our team.